Electricity · Gas · Water · Sewer · Fibre

New utility connections, handled for you.

We prepare your utility applications, deal with the network operators and water companies, check every quote and keep your supplies on programme. You get one point of contact for every connection on the site.

  • Self-builds to large housing sites
  • Applications across Great Britain
  • Free, no-obligation quote
Why it matters

Most connection delays start with the application

Utilities are often the last thing booked and the first thing that holds up completion. The usual causes are avoidable.

  • Applying too late. Network operators work to their own timescales. A late application can leave a finished home with no power or water.
  • The wrong load figures. Asking for too little capacity means a costly second application. Asking for too much can trigger reinforcement charges you didn't need.
  • Missing drawings or details. Incomplete applications get sent back, and the clock starts again.
  • Taking the first quote. Much of the work can be quoted by independent providers too. Many people never ask for a second price.
How we fix it

We run your applications like a project

  • We confirm which network operators and water company cover your site, and what each one needs.
  • We work out loads and demand with you, including heat pumps, EV chargers and future plans.
  • We prepare and submit complete applications, with the drawings in the format each operator wants.
  • We get competing quotes where the rules allow, and check every offer for exclusions and extras.
  • We chase, answer queries and line up connection dates with your build programme.
See the full process
How it works

Four steps from enquiry to live supplies

  1. Tell us about the site

    Send the address, plans and what you're building. Five minutes on our form is enough to start.

  2. We confirm the route

    We identify the operators, the information needed and any risks to cost or timing, then send our quote.

  3. We apply and compare

    We prepare and submit every application, get alternative quotes where possible and check each offer.

  4. We see it through

    We handle acceptance paperwork, dates, meters and queries until your supplies are live.

Free connection planner

What will your site need, and how long will it take?

Pick your project and the utilities you need. You'll get typical lead times, the information to have ready and when to start applying.

1. What are you building?
2. Which utilities?
3. How will it be heated?
Future Homes Standard

Building all-electric? Plan the bigger supply now.

From 24 March 2027, new homes in England are built to the Future Homes Standard, which is designed around heat pumps and solar panels. Homes built to it won't need a gas connection for heating, but each one needs more from its electricity supply.

Homes already notified to building control before that date can still be built to the current rules if work on each home starts before 24 March 2028. Many sites will have a mix, so the utility applications need to match.

Getting the electricity load right at application stage is what keeps reinforcement costs and delays down. We work it out with you before anything is submitted, including EV chargers, batteries and solar.

Read the guide

Heat pumps

A bigger load per home, so the supply size matters.

EV charging

In England, new homes with parking need a charge point, which adds to the load.

Solar and batteries

Some systems need the network operator's approval before they connect.

Gas, if needed

We still arrange gas where your design and the rules call for it.

Utility connection questions

Straight answers to what we are asked most. There are more on our FAQ page.

What is a utility application?

It is a formal request to a network operator or water company for a new connection, more capacity, a temporary supply, a diversion or a sewer connection. Each utility has its own application, fees and information requirements.

When should I apply for new utility connections?

As early as you can, ideally once you have planning permission and a site layout. A single home can often be connected a couple of months after the offers are accepted, while larger schemes, high-voltage work or network reinforcement can take many months. Quotes are time-limited (90 days is common), so we time applications to match your programme.

Do you do the connection work yourselves?

No. We manage the applications and the process. The connection work is carried out by the network operator, the water company or an accredited independent provider. That means we can compare options for you rather than sell you our own installation.

Can you get a cheaper quote than the network operator?

Often there is a choice. Much electricity, gas and water connection work is contestable, which means accredited independent providers can quote for it. We ask for alternatives where they are available and compare them like for like.

Which areas do you cover?

We handle applications across England, Wales and Scotland. Every network operator and water company area has its own process, and we work with all of them.

What do you need from me to get started?

The site address, a location plan, a site layout, the number and type of homes or units, and when you need supplies. If you have load figures, drainage drawings or existing utility records, send those too. We will tell you what else is needed.

Do new homes still need a gas connection?

Fewer will. The Future Homes Standard comes into force in England on 24 March 2027 and is designed around heat pumps, so homes built to it won't need a gas connection for heating. Homes notified before then can still use gas if work starts before 24 March 2028. Either way, the electricity application matters more than ever.

How much does a new utility connection cost?

The connection itself is priced by the operator and depends on distance to the network, capacity, road works and any reinforcement. Our fee for managing the applications is quoted up front. Our connection costs guide explains what drives the price.

Ready to get your connections moving?

Tell us about the site and the utilities you need. We will come back with the right application route and a clear quote for managing it.